Before installation

Site Preparation Guide

A level, accessible and properly planned location is one of the most important parts of a successful shed installation.

1. Confirm the product footprint

Use the manufacturer’s outside dimensions and base dimensions when available. Do not rely only on a rounded product name such as “8×10.”

2. Choose a well-drained location

Avoid areas where water regularly collects. Good drainage helps protect the base and makes the area easier to maintain.

3. Prepare the required base

Different products may require concrete, gravel, a wood platform or another approved foundation. Follow the manufacturer requirement for the exact model.

4. Make the site level

An out-of-level base can make wall panels, doors and roofs difficult to align and may affect long-term product performance.

5. Measure delivery access

Check driveway width, gate width, turns, slopes, steps, fences, trees and overhead obstacles from the street to the installation area.

6. Locate utilities

Consider underground utilities, irrigation lines, septic systems, electrical service, gas lines and overhead wires before preparing or digging at the site.

7. Check local rules

Review permits, zoning, setbacks and HOA restrictions before installation. Requirements can depend on size, height, foundation, location and local jurisdiction.

8. Clear the work area

Remove furniture, vehicles, tools, children’s play equipment, pets and other obstacles before the scheduled installation.

9. Keep access available on installation day

Make sure gates are unlocked, vehicles are moved and the installation team can reach the work area at the scheduled time.